Wastewater Recharge and Wetland Construction in Tucson Case Study Handout

The Sweetwater Recharge Facilities (SRF) and Wetlands were established in the 1980s as one strategy to reduce the City of Tucson’s unsustainable reliance on groundwater by treating wastewater to reuse for non-potable water needs while simultaneously providing habitat for wildlife. In addition to the 40 acres of recharge basins, SRF includes 22 acres of constructed wetlands.

Read the full Case Study here: https://www.fws.gov/project/wastewater-recharge-and-wetland-construction-tucson.

Publication date
Type of document
Fact Sheet
Media Usage Rights/License
Public Domain
Program
The Conservation and Adaptation Resources Toolbox logo which includes a butterfly flying over a stream with a fish in it. On the stream bank there are two trees and a windmill.
For over eight years, CART enhanced collaborative conservation efforts at all scales by facilitating issue-based, not geography-based, peer-to-peer knowledge sharing. By connecting hundreds of individuals from dozens of organizations across North America, CART helped bridge the gaps between work at...