Beaver Dam Analog 3 weeks post construction

Photo By/Credit

Allaire Diamond/Vermont Land Trust

Date Shot/Created
11/01/2021
Media Usage Rights/License
Copyrighted, All Rights Reserved - Used by Permission
Image
Close up of a beaver dam analogue three weeks post-construction, showing vertical buckthorn posts, woven willow stems, and hay used to build the structure, and water pooling on the upstream (left) side after a rainstorm.