Fish have been produced in the northern Sacramento Valley for over 100 years. The first National Fish Hatchery, known as Baird Station, was established in 1872 on the McCloud River.  The hatchery raised Chinook salmon and transferred eggs throughout the country, but most egg transfers were unsuccessful.  The Baird Station is now located under Lake Shasta.  Another facility, the Battle Creek National Fish Cultural Station, located near the mouth of the Sacramento River, was established in 1896.

The Coleman National Fish Hatchery was established in 1942 to mitigate the loss of natural salmon to historic spawning areas. Construction of Shasta and Keswick dams blocked access to approximately 187 miles of upstream habitat.  Historically, Chinook salmon and steelhead trout migrated to the upper reaches of the Sacramento, Pit, and McCloud rivers to spawn.

Historical photo of men standing next to a boat in a creek moving adult salmon from the creek onto the bank.
Hatchery broodstock were collected from Battle Creek at the Battle Creek National Fish Culture Station. Circa 1896

Construction of the facility was authorized and established under the provisions of the Emergency Relief Appropriation Act of 1935 (49 Stat. 115) and the First Deficiency Appropriations Act, Fiscal Year 1936 (49 Stat. 1622). The Rivers and Harbors Act of 1937 (50 Stat. 844,850) re-authorized the CVP for construction by the Secretary of the Interior and subject to the Reclamation laws. Total cost for the hatchery and Keswick Fish Trap was $2,013,750.

Coleman NFH is located in Shasta County, California, on a relatively flat parcel of land on the north bank of Battle Creek approximately three miles east of the Sacramento River and twenty miles southeast of the city of Redding. Battle Creek provides surface water supply for the hatchery. The discharge of Battle Creek is regulated above the hatchery by four small power plants and several small reservoirs and diversions. To the north and south of the hatchery lie the rolling foothills of the Cascade Range with peaks ranging from 1,000 to 2,700 feet MSL.

Small valleys and sharp breaks in the land are produced by numerous seasonal streams draining the area. Battle Creek flows through a valley from the east to the west along the south edge of the hatchery property. Battle Creek enters the Sacramento River five river miles to the west of the hatchery.

Historical photo of men using a large net to seine fish out of a creek.  Two men are in the foreground holding the end of a net, while a man in a boat is rowing a boat in the stream and spreading the net across the stream.
At the historical Battle Creek Fish Culture Station adult Chinook salmon were collected from Battle Creek using seine nets. The men on shore held one end of the net, while another man in a boat paddled backwards into the stream slowly stretching the net across the stream. The far end of the net would then be pulled back to shore to create a large circle. The adult fish captured would be used for spawning.