Endangered Species

Midwest Region

 

 

Midwest Region State Map

The Midwest Region includes Illinois, Indiana, Iowa, Michigan, Minnesota, Missouri, Ohio and Wisconsin. Find a location near you

 


Endangered Species Program

Conserving and restoring threatened and endangered species and their ecosystems

 


Great Lake Restoration Initiative logo

Indiana Bat and Northern Long-eared Bat

Biological Opinions

Midwest Biological Opinions

 

Date
Action
Species
State
Field
Office
Federal Agency
Project Title
10.12.2018 Transmission line: clearing and row access, transmission line structures placement, stringing of the conductor and restoration of the right-of-way

Gray bat

Indiana bat

IN Indiana FO USACOE Republic Transmission Transmission Line project
09.17.2018 Construction to expand a foundry plant Indiana bat IN Indiana FO COE Waupaca Foundry Plant 5 Expansion
09.14.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT LAW-US52-11.53 PID 104167
09.14.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT ROS-207 PID 93744
08.23.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT WAS-339-22.65 PID 108328
08.18.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT SUM-8-1.75 PID 91710
08.14.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT MRG-555-24.60 PID 108379
08.03.2018 Building Construction on wetlands

Indiana bat

Northern long-eared bat

Ohio Ohio FO COE Aurora Animal Care Center
08.02.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT MOE-536-9.80 PID 108553
07.31.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT WAS-260-9.00 PID 108383
07.31.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT MOE-536-8.90 PID 108552
07.31.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT MOE-255-17.32 PID 108505
07.30.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT ATH-144-5.15 PID 108276
07.30.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT WAS-145-1.51 PID 108329
07.19.2018 Forest management Indiana bat MI MI FO USFS Huron Manistee NF Gilbert Lake Project
07.16.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT WAS-26-7.63 PID 108490
07.16.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT WAS-26-7.63_PID_108490
07.16.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT ATH-690-4.46 PID 108378
07.16.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT MOE-536-5.95 PID 107734
07.16.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT MRG-376-11.00 PID 108327
07.16.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT NOB-78-2.10 PID 108330
07.09.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT WAS-26-29.50 PID 108400
07.06.2018 Multi-use trail construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT SUM-Veterans Trail Phase 3 PID 97856
07.06.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT MOE-536-2.26 PID 108333
07.06.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT MOE-26-9.56 PID 108440
07.06.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT HAM-74-11.14 PID 108117
07.06.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT ATH-13-0.60 PID 108481
07.06.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT MOE-537-2.10 PID 108336
07.06.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT MRG-266-3.30 PID 108326
07.03.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT RIC-30.11.58 PID 98911
06.13.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT WAS-77-16.61 PID 107900
06.04.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT FRA-33-24.26 PID 98111
06.04.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT NOB-313-0.67 PID 107894
05.18.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT ATH-124-2.12 PID107805
05.18.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT ATH-144-4.92 PID 108166
05.18.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT ATH-550-14.95 PID 107882
05.18.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT ATH-550-15.70 PID-107885
05.16.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT WAS-821-10.22 PID 108162
05.15.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT MOE-536-8.50 PID 107729
05.11.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT BEL-147-25.48 PID 108069
05.10.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT HOC-56-11.00_PID_107781
05.10.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT BEL-CR350-0.34 PID 107817
05.10.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT MOE-556-4.15 PID 107864
05.10.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT WAS-77-6.07 PID 107841
05.10.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT OTT-163-38.19 PID 108279
05.04.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT MEG-124-32.10 PID 108367
04.24.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT WAS-7-42.00 PID 107741
04.24.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT MOE-26-12.32 PID 107807
04.23.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT MOE-537-4.50 PID 107786
04.23.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT MOE-255-14.30 PID 107809
04.23.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT MOE-536-7.48 PID 107733
04.23.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT MOE-536-11.65 PID 107937
04.23.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT MOE-26-22.01 PID 107935
04.23.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT MOE-255-16.70 PID 107811
04.23.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT NOB-260-6.80 PID 107778
03.09.2018 Residential development Indiana bat IN Indiana FO COE Victoria Preserve Development
02.12.2018 Bike path bridge construction

Indiana bat

Northern long-eared bat

IN Indiana FO FHWA/ODOT MOT Stillwater Bikeway Bridge PID 99981
01.17.2018 Quarry pit, grinding plant, and stockpile and overburden areas Indiana bat IN Indiana FO COE Indian Creek Quarry
01.11.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT CAR-Carroll FS PID 96123
01.02.2018 Highway construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT LUC-475-1.85 PID 99731
12.20.2017 Reclaiming abondoned mine land

Indiana bat

Northern long-eared bat

Ohio Ohio FO OSM OSM Ohio Abandoned Mine Land Program
12.14.2017 Construction for theme park and resort Indiana bat New York New York FO USACOE LEGOland
12.07.2017 Bike and walking trail construction

Indiana bat

Northern long-eared bat

Ohio Ohio FO FHWA/ODOT WAS River Trail Phase V PID 95320
11.30.2017 Timber Stand Improvement

Indiana bat

Northern long-eared bat

MO Missouri FO USFS Wappapello Lake TSI Management Strategies
11.30.2017 Amended BO for issuing Recovery Pemits Northern long-eared bat Rangewide in R3 Regional Office USFWS Amended NLEB BO for Recovery Permits
11.02.2017 Road Project

Indiana Bat

Northern Long-eared Bat

OH OHFO FHWA/ODOT Franklin County Road Project
09.13.2017 Conversion of pine to hardwoods

Indiana bat

Northern long-eared bat

OH OHFO USFS Wayne NF - Kehota Vegetation Management
08.21.2017 Road Project - Plan modification; Reinitiation

Indiana Bat

Northern Long-eared Bat

OH OHFO FHWA/ODOT Delaware County Road Project - Reinitiation
06.26.2017 Salvage storm damaged timber; Tier II BO Indiana bat IL Marion FO USFS Kinkaid Salvage Project - Shawnee NF
05.30.2017 Road Project

Indiana Bat

Northern Long-eared Bat

OH OHFO FHWA/ODOT Columbiana County Road Project
05.25.2017 Road Project

Indiana Bat

Northern Long-eared Bat

OH OHFO FHWA/ODOT Delaware County Road Project
05.17.2017 Bat Deterrent Acoustic Study

Indiana Bat

Northern Long-eared Bat

OH OHFO DOE Bat Deterrent Acoustic Study
05.01.2017 Wildlife and Sport Fish Restoration Grant to MO

Indiana Bat

Northern Long-eared Bat

MO Missouri FO USFWS Missouri Wildlife Restoration Program Grant (MO-W93_d_23)
04.26.2017 Road Project

Indiana Bat

Northern Long-eared Bat

OH OHFO FHWA/ODOT Brown County Road Project
04.26.2017 Road Project

Indiana Bat

Northern Long-eared Bat

OH OHFO FHWA/ODOT Lucas County Road Project
02.17.2017 Construction of a quarry pit, grinding plant, stockpile, overburden areas and berms. Indiana Bat IN Indiana FO COE NALC Limestone Quarry Project
12.14.2016 Gas Transmission Pipeline

Indiana Bat

Northern Long-eared Bat

OH OHFO FERC NEXUS Pipeline
11.16.2016 Commercial development

Indiana Bat

Northern Long-eared Bat

NY NY FO US Army COE Amy's Kitchen
10.15.2016 Oak Savanna Restoration and Monitoring

Karner Blue Butterfly

Mitchell's Satyr

Northern Long-eared Bat

MI ELFO FWS MI DNR Competitive SWG - Oak Savanna Restoration and Monitoring
10.14.2016 WNS Treatment Studies

Indiana Bat

Northern Long-eared Bat

IL

MI

RIFO

ELFO

USFWS Recovery Permit for WNS Treatment Studies
10.10.2016 Road Projects/Tree Removal

Indiana Bat

Northern Long-eared Bat

OH OFO FHWA/ODOT Road Project
10.05.2016 Timber Harvest

Indiana Bat

Northern Long-eared Bat

IL MISO USFS Shawnee NF Lee Mine Project
09.23.2016 Timber Management

Indiana Bat

Northern Long-eared Bat

MO CMFO USFS Mark Twain NF Blackwell Ridge Project
08.16.2016 ITP for Wildcat Wind Farm

Indiana Bat

Northern Long-eared Bat

IN BFO FWS Wildcat Wind Farm ITP
05.20.2016 Transportation Projects

Indiana Bat

Northern Long-eared Bat

Rangewide BFO and others

FHWA

FRA

FTA

Programmatic consultation on transportation projects
05.02.2016 Rail Improvement Indiana Bat OH OFO COE Jewett rail improvement
02.29.2016 Programmatic BO for transportation projects

Northern Long-eared Bat

Indiana Bat

OH OFO FHWA Programmatic Biological Opinion for Ohio Transportation Projects
02.27.2016 Road Project

Indiana Bat

Northern long-eared bat

OH OHFO FHWA Road Project
02.22.2016 Commercial development Indiana bat IN BFO COE KDC Jeff commercial development 35-page PDF
02.05.2016 Open-pit mine and
processing polymetallic ore. Land exchange
Northern long-eared bat Minnesota TCFO

USFS

COE

PolyMet Mining NorthMet Project and Land Exchange 87-page PDF (1.7MB)
01/05/2016 Programmatic BO on final 4(d) rule - activities excepted from take prohibitions Northern long-eared bat NLEB range R3 RO All Programmatic BO on final 4(d) rule for the northern long-eared bat and activities excepted from take prohibitions 109-page PDF (2.6MB)
11/12/2015 FS Eastern Region proposes to continue implementation of existing Forest Plans, without modification, on 14 National Forests and 1 National Tallgrass Prairie within the range of the northern long-eared bat Northern long-eared bat IL, IN, ME, MI, MN, MO, NH, NY, OH, PA, VT, WV, WI R3 RO USFS Implementation of existing Forest Plans - USFS Eastern Region 112-page PDF (1.3MB)
11/09/2015 Special use permits for road construction Northern long-eared bat MN TCFO USFS Superior NF Special Use Projects 37-page PDF
11/04/2015 Thinning, prescribed burns, invasive plant control, road system mgmt. Northern long-eared bat MI ELFO USFS Hiawatha NF East Red Pine Project
10/14/2015 Michigan DNR WSFR Grants Northern long-eared bat MI ELFO USFWS WSFR Grant Program to Michigan DNR
10/08/2015 Hoosier NF Ongoing Activities Northern long-eared bat IN BFO USFS Hoosier NF Ongoing Activities
10/06/2015 Ongoing vegetation and land management activities Northern long-eared bat WI TCFO USFS Chequamegon/Nicolet NF vegetation management 42-page PDF
09/14/2015 Vegetative, wildlife and road system management Northern long-eared bat MI ELFO USFS Huron-Manistee NF Bigelow-Newaygo Project 74-page PDF
09/03/2015 Construction of distribution and manufacturing campus for Menard Corporation

Indiana bat

Northern long-eared bat

MO CMFO COE Menard Industrial Campus, Sullivan, MO 35-page PDF
09/03/2015 Grant for Bat Ecology Study

Indiana bat

Northern long-eared bat

IN BFO USFWS WSFR Grant to Indiana DNR - Bat Ecology Study 2-page PDF
08/26/2015 HCP Planning Assistance Grant to Iowa DNR - Baseline studies

Indiana bat

Northern long-eared bat

IA RIFO USFWS IADNR HCP Planning Assistance Grant 45-page PDF (10MB)
08/21/2015 Military smoke obscurants training Northern long-eared bat WI TCFO DOD Fort McCoy Military Smoke Obscurant 36-page PDF
08/14/2015 WSFR Grant to Minnesota DNR Northern long-eared bat MN TCFO USFWS MN DNR State Wildlife Habitat Management Grants 39-page PDF
08/07/2015 Silviculture treatements to improve forest health and wildlife habitat diversity

Indiana bat

Northern long-eared bat

MO CMFO USFS Mark Twain NF; East Fork Huzzah Project 42-page PDF
08/05/2015 Roadway Re-alignment; Tier II BO Indiana bat Ohio OFO FHWA Realignment of approximately SR 125 in Adams County 7-page PDF; 2.8MB
08/05/2015 Roadway re-alignment and bridge replacement; Tier II BO Indiana bat Ohio OFO FHWA Turkey Run Road Relignment and Bridge Replacement 7-page PDF; 3.4MB
07/31/2015 Gas pipeline

Indiana bat

Northern long-eared bat

OH OFO COE East Ohio Gas Co.'s Western Access II Project 51-page PDF
07/09/2015 Special Use Permits: recreation trail development, roads, mineral exploration Northern long-eared bat MN TCFO USFS Superior NF Ongoing recreation, special uses and minerals exploration 43-page PDF
07/2015 Ultrasonic Bat Deterrent Technology Effectiveness Research Indiana bat IL RIFO DOE Ultrasonic Bat Deterrent Research 23-page PDF
07/2015 Ultrasonic Bat Deterrent Technology Effectiveness Research Northern long-eared bat IL RIFO DOE Ultrasonic Bat Deterrent Research 23-page PDF
06/22/2015 Recovery Permits in the USFWS Midwest Region Northern long-eared bat IL, IN, IA, MI, MN, MO, OH, WI RO USFWS Recovery Permits issued for northern long-eared bat in USFWS Region 3 (46-page PDF; 6MB)
06/18/2015 Shelterwood harvest, prescribed fire, TSI, skid trails and log landings. Northern long-eared bat IL MISO USFS Harris Branch Project; Shawnee NF (32-page PDF)
06/2015 Forest management Northern long-eared bat ME, NH, VT New England and Maine FOs USFWS Ongoing activities on
Green Mountain NF, Vermont
and White Mountain NF, New Hampshire and Maine
05/27/2015 Timber harvest, tree removal, fuels reduction, prescribed fire Northern long-eared bat MN TCFO USFS Superior NF timber harvest, tree removal, fuels reduction, Rx burns 42-page PDF
05/14/2015 Timber harvest, prescribed fire, post harvest treatments, road mgmt. Northern long-eared bat MN TCFO USFS Superior NF Pearl vegetation management 60-page PDF
05/08/2015 Timber harvest, prescribed fire, fuel reduction Northern long-eared bat WI TCFO USFS Chequamegon-Nicolet NF Batched Vegetation Mgmt Projects 41-page PDF
05/07/2015 Kalamazoo River Oil Spill Response Indiana bat Michigan ELFO EPA Kalamazoo River Oil Spill Response 26-page PDF; 337KB
05/06/2015 Timber harvest and post-harvest treatments Northern long-eared bat MN TCFO USFS Chippewa NF Batched Vegetation Mgmt Projects 40-page PDF
05/06/2015 Prescribed fire and fuels management Northern long-eared bat MN TCFO USFS Chippewa NF Batched Prescribed Fire and Fuel Mgmt Projects 41-page PDF
05/04/2015 Tree harvest and fire treatments Northern long-eared bat MN TCFO USFS Superior NF - Windy Project 54-page PDF
05/04/2015 Tree removal for transmission line protection Northern long-eared bat MN TCFO USFS Chippewa NF - Great River Energy Tree Removal Project 32-page PDF
05/01/2015 Mark Twain National Forest Ongoing Activities Northern long-eared bat MO CMFO USFWS Mark Twain NF Ongoing Activities (952 KB PDF)
05/01/2015 Huron-Manistee National Forest Management Northern long-eared bat MI ELFO USFS Huron-Manistee NF

Appendix C Map 1

Appendix C Map 2

05/01/2015 Hiawatha National Forest Management Northern long-eared bat MI ELFO USFS

Hiawatha NF (1MB PDF)

Appendix B - Map 1 (388KB)

Appendix B - Map 2 (342KB)

05/01/2015 Ottawa National Forest Management Northern long-eared bat MI ELFO USFS Ottawa NF (812 KB PDF)
05/01/2015 Wayne National Forest Ongoing Projects Northern long-eared bat OH OFO USFW Wayne NF 45-page PDF
04.28.2015 Fort Drum Ongoing Activities Northern long-eared bat Cortland NY Army   Fort Drum Ongoing Activities (61-page PDF)
04/28/2015 Highway Bypass - Conference Opinion to Biological Opinion Northern long-eared bat Ohio OFO FHWA Portsmouth Bypass CO to BO 2-page PDF
04/27/2015 Conference Opinion on State Road 641 Terre Haute Bypass

Northern long-eared bat IN

BFO

FHWA

State Road 641 Terre Haute bypass

04/21/2015 Conservation MOA for the Indiana Bat and Northern Long-eared Bat

Indiana bat

Northern long-eared bat

KY Atlanta, GA Regional Office FWS Kentucky Field Office Conservation MOA for INBA and NLEB (1.3 MB PDF)
04/02/2015 WSFR Grants to MDC

Indiana bat

Northern long-eared bat

MO CMFO USFWS Missouri DOC Wildlife Restoration Program Grant and State Wildlife Grant
04/01/2015 Wind energy HCP and Incidental Take Permit

Indiana bat

Northern long-eared bat

IL RIFO USFWS Pioneer Trail Wind Farm HCP and IT Permit 30-page PDF (4.4MB)
04/01/2015

Conference Opinion Interstate Highway expansion; Tier I Northern long-eared bat

In BFO FHWA I-69 from Evansville to Indianapolis -Tier I BO Amendment #3: NLEB Conf. Opin. 90-page PDF; 1.4 MB

Amendment Summary (Excel)
03/19/2015 Timber stand improvement

Indiana bat

Northern long-eared bat

Missouri CMFO USFS Wappapello Lake TSI 42-page PDF; 1MB
01/28/2015 Road widening and realignment; Tier II BO Indiana bat Ohio OFO FHWA State Road 266 widening and realignment; 7 page PDF
01/23/2015 Road work; Tier II BO Indiana bat Ohio OFO FHWA U.S. 6 bridge and road work 7-page PDF
01/09/2015 Highway bypass Northern long-eared bat OH OFO FHWA Portsmouth Bypass 55-page PDF; 3MB
01.2015 Monongahela National Forest Management

Northern long-eared bat

WV Elkins,
WVFO
USFS Monongahela NF Conference Opinion for NLEBĀ 31-page PDF
10/01/2014 Construction of daycare center Indiana bat Ohio OFO COE Ciance Builders Day Care Center 38-page PDF; 4.3MB
06/30/2014 Road reconstruction; Tier II BO Indiana bat Ohio OFO FHWA Red Bank Road Improvement

6-page PDF; 3.1MB

04/15/2014 Culvert, road and bridge maintenance; Tier II BO Indiana bat Ohio OFO FHWA

Summit County Road and Bridge Maintenance

8-page PDF; 96KB

03/07/2014 Wind Farm Indiana bat Indiana BFO USFWS

IT Permit/HCP

Fowler Ridge Wind Farm

69-page PDF; 840KB

02/12/2014 Remove hazardous rocks along highway; Tier II BO Indiana bat Ohio OFO FHWA

Remove hazardous rocks SR 800 Monroe Cty.

6-page PDF; 3.2MB

02/10/2014 Harvest, thinning, pond maintenance, burning, road maintenance Indiana bat Missouri Columbia, Missouri USFS - Mark Twain NF Mark Twain NF - Boiling Spring Project in Texas county 8-page PDF; 771KB
01/28/2014 Road resurfacing and ditch relocation; Tier II BO Indiana bat Ohio OFO FHWA

Road resurfacing and ditch relocation SR523

6-page PDF; 3,3MB

01/23/2014 Higway Reconstruction; Tier II BO Indiana bat Ohio OFO FHWA

Kibby Street Project

5-page PDF; 2.8MB

01/17/2014 S10 IT Permit and HCP: Wind Energy Project HCP Indiana bat Maryland Chesapeake Bay - Annapolis MD USFWS Criterion Wind Project HCP BO 56-page PDF; 742KB
12/24/2013 Interchange and intersection upgrades Indiana bat Ohio Columbus, Ohio FHWA Interchange and Intersection upgrades 6-page PDF; 2MB
12/16/2013 Road work Indiana bat Ohio Columbus, Ohio FHWA State Rd 7 slope stablization - Jefferson Cty. 6-page PDF; 3.2MB
12/16/2013 Road work Indiana bat Ohio Columbus, Ohio FHWA State Rd. 7 slope stablization Warren Twnship Jefferson Cty 6-page PDF; 2.8MB
12/15/2013 Interstate interchange improvements Indiana bat Ohio Columbus, Ohio FHWA I-70 and I-71 interchange improvements 5-page PDF; 2.6MB
12/04/ 2013 Quarry expansion Indiana bat Iowa Rock Island COE LaFarge Quarry Expansion 29-page PDF; 4.2MB
12/04/2013 Bridge Replacement Indiana bat Ohio Columbus, Ohio FHWA Replace Cty. Rd. 50 Bridge 5-page PDF; 2.9MB
10/18/2013 Bridge Replacement Indiana bat Ohio Columbus, Ohio FHWA Replace Rt. 22 bridge over Little Rush Crk 5-page PDF; 2.2MB
09/27/2013 Bridge Replacement Indiana bat Ohio Columbus, Ohio FHWA State Rt. 534 bridge replacements 6-page PDF; 873KB
09/27/2013 Bridge Replacement Indiana bat Ohio Columbus, Ohio FHWA Washburn Rd. Bridge replacement over Ten Mile Crk 5-page PDF; 472KB
09/13/2013 Highway work Indiana bat Ohio Columbus, Ohio FHWA Taylor Rd sidewalk and turn lane 5-page PDF; 2.3MB
07/25/2013 Interstate Highway Extension Indiana bat Indiana Bloomington, Indiana FO FHWA Section 5 of Interstate 69 (I-69) Extension from Evansiville to Indianapolis (78-page PDF; 1.6MB)

 

Appendix A

Amendment

07/24/2013 I-69 Evansville to Indianapolis Reinitation of Tier 1 Programmatic BO Indiana bat Indiana Bloomington, Indiana FO FHWA

I-69 Tier 1 Reinitiation

Cover Letter

Summary Tables

 

07/24/2013 593-Mile Crude Oil Pipeline across 4 States Indiana bat Illinois, Kansas, Missouri, Oklahoma R3 RO COE and BIA

Enbridge Pipeline Biological Opinion July 24, 2013 (86-page PDF; 1.6MB)

 

Letter to Kansas City COE District re: American Burying Beetle Impacts (Aug. 6, 2013)

 

Amended IT Statement and Transmittal Letter to COE (Aug. 12, 2013)

07/17/2013 Research on acoustic deterrent and curtailment speed at a wind farm Indiana bat Illinois Rock Island, Illinois USFWS

(Recovery Permit)

Acoustic Deterrent and Curtailment Speed Research at California Ridge Wind Project, Illinois (12-page PDF; 1.2MB)
07/11/2013 Wind Farm HCP Indiana bat Ohio Columbus, Ohio USFWS

IT Permit/HCP

Buckeye Wind IT Permit and HCP (80-page HCP; 2.3MB)
06/13/2013 Correct Landslide Damage on Cty. Road Indiana bat Ohio Columbus, Ohio FHWA Correct landslide damage to Cty Rd 505
05/17/2013 Reduce fuels Indiana bat Missouri Columbia, Missouri USFS - Mark Twain NF Mark Twain NF Bunker Area Fuels Project 6-Page PDF; 987KB
05/15/2013 Bridge Replacement Indiana bat Ohio Columbus, Ohio FHWA State Rd 109 Bridge Replacement over Maumee River
04/25/2013 Bridge Replacement Indiana bat Missouri Columbia, Missouri USFS - Mark Twain NF Trace Creek and Council Bluff Trails Reroutes
03/11/2013 Timber Stand Improvement Mgmt. Strategies Indiana bat Missouri Columbia, Missouri COE Wappapello Lake Timber Stand Improvement (34-page PDF; 4.8MB)
02/27/2013 West Virginia DNR Forest Management Plan Indiana bat West Virginia West Virginia FO

Elkins, WV

FWS - WSFRP Programmatic Forest Managment Plan for Potential Indiana Bat Habitat Areas on Wildlife Management Areas (62-page PDF; 1.9MB)
01/31/2013 Multi-use Trail Construction Indiana bat Ohio Columbus Ohio FHWA Independence Trail Construction
Dec. 21, 2012 Overstory removal

Indiana bat Pennsylvania

Pennsylvania FO

NRCS

Golden-winged warbler habitat creation (45-page PDF; 932KB)

October 5, 2012 Commercial harvest, tsi, and site prep Indiana bat Missouri Columbia, Missouri USFS - Mark Twain NF Mark Twain NF - Northeast Lake Project in Wayne County 6-page PDF; 843KB
March 1, 2012 Forest Management Indiana bat West Virginia Elkins, West Virginia Forest Service Upper Greenbriar North Project - Monongahela National Forest (35-page PDF; 923KB)
Feb. 2, 2012 Wind energy development and smoke operations

Indiana bat NY Cortland, New York DOA Effect of Proposed
Activities On Fort Drum (2012-2014)
(85-page PDF; 4.1MB)
Nov. 30, 2011 Bridge Replacement Indiana bat Ohio Columbus, Ohio FHWA County Rd. 338 Bridge Replacement UNI-CR338-0.39 (PID 82359) (6-page PDF; 410KB
November 29, 2011 Road widening Indiana bat Ohio Columbus, Ohio FHWA State Rd. 534 widening TRU-534-24.32 (PID 23967) (5-page PDF; 442KB
October 31, 2011 Connecting road construction Indiana bat Ohio Columbus, Ohio FHWA PIC-East West Connector (PID 83666) (5-page PDF; 467KB)
October 18, 2011 Hazard Tree Removal: Tier 2 Indiana bat Ohio Columbus, Ohio FHWA Hazard Tree Removal and Trimming GEA-PRFY2012-Tree Removal (PID 89318) (5-page PDF; 497KB)
October 3, 2011 Road bank repair Indiana bat Ohio Columbus, Ohio FHWA US 40 Bank Repair MAD-40-0.86 (PID 89178) (5-page PDF; 445KB)
September 29, 2011 Culvert replacement Indiana bat Ohio Columbus, Ohio FHWA Culvert Replacement MED-94-17.98 (PID 87439) (5-page PDF; 359KB)
September 27, 2011 Wind Farm Indiana bat Pennsylvania State College, PA Corps of
Engineers
Shaffer Mountain Wind Farm (95-page PDF; 1.8MB)
September 14, 2011 Bike Path Indiana bat Ohio Columbus, Ohio FHWA East Fork Bike Path - Section One (PID 80467) (6-page PDF; 457 KB)
July 6, 2011 Interstate Highway construction Indiana bat Indiana Bloomington, IN FHWA Section 4 of I69 Extension - Tier 2 (PDF: 90 pages, 1.7MB)
June 27, 2011 Wind Turbine Project Indiana bat Illinois Rock Island, IL U.S. Dept. of Energy Monarch Wind Farm (PDF: 27 pages, 596MB)
June 7, 2011 Highway construction Indiana bat Indiana Bloomington, IN FHWA State Road 641; Terre Haute Bypass (PDF: 31 pages, 112KB)
May 25, 2011 Interstate highway construction: Amendment to Tier I Programmatic BO (dated Aug. 24, 2006) Indiana bat Indiana Bloomington, IN FHWA I-69, Evansville to Indianapolis, IN Highway (PDF: 37 pages, 420 KB)

 

Cover Letter (PDF)
April 8, 2011 Bridge replacement Indiana bat Ohio Columbus, Ohio FHWA Cotton Run Creek Bridge Replacement: BUT -73-12.20 (PID 77915) (5-page PDF: 401KB)
April 7, 2011 Highway interchange Indiana bat Ohio Columbus, Ohio FHWA US 27 Interchange: HAM-27-16.79 (PID 83079) (7-page PDF; 564KB)
January 28, 2011 Timber management: Tier 2 Indiana bat Ohio Columbus, Ohio US Forest Service Wayne National Forest: Pleasant Bear Vegetation Management Project (6-page PDF)
January 3, 2011 IntraService consultation on FWS's participation In and Approval of Conservation MOA for Indiana Bats Indiana bat Kentucky Frankfort, Kentucky USFWS Conservation MOA for Indiana Bats (110-page PDF; 33MB)
Dec. 21, 2010 Culvert replacement Indiana bat Ohio Columbus, OH FHWA State Rd. 545 Culvert Replacement (5-page PDF; 26KB) [RE: RIC-545-6.75 (PID 87441)]
Dec. 17, 2010 Intra-Service consultation on Section 10(a)(1)(A) Activities for Listed Bats in the Southeast Region Indiana bat Kentucky Frankfort, Kentucky USFWS Intra-Service Consultation on issuing Recovery Permits in the Southeast Region for Listed Bats (50-page PDF: 12MB)
Dec. 16, 2010 Road realignment; STR 148 - Tier 2 Indiana bat Ohio Columbus, OH FHWA State Road 148 Realignment (PDF: 7 pages, 33KB) [RE: BEL-148-22.80 (PID 80209)]
Nov. 24, 2010 Highway Widening Indiana bat Ohio Columbus, OH FHWA U.S. 23 Widening (5-page PDF; 26 KB) RE: FRA-23-23.61 (PID 87779)
Nov. 22, 2010 Road relignment; US 6: Tier 2 Indiana bat Ohio Columbus, OH FHWA US 6 Relignment (PDF: 5 pages, 26KB) RE: ERI-6-5.70 (PID 23105)
Nov. 22, 2010 Bridge Replacement: Tier 2 Indiana bat Ohio Columbus, OH FHWA US 250 Stone Bridge Replacement (5-page PDF; 25KB) RE: HUR-250-15.54 (PID 76975)
October 21, 2010 Military training and land mgmt. Indiana bat Indiana Bloomington, IN National Guard Bureau Camp Atterbury (84-page PDF: 2.5MB)
July 2, 2010 Bridge Replacement: Tier 2 Indiana bat Ohio Columbus, OH FHWA County Rd. 24 Bridge Replacement (5-page PDF: 26KB) [RE: PRE-CR24-3.24 (PID 82901)]
June 18, 2010 Extend bike and walking path: Tier 2 Indiana bat Ohio Columbus, OH FHWA Heath Bike/Pedestrian Path (5-page PDF; 25KB) [RE: LIC-Heath Bike/Pedestrian Path (PID 83626)]
May 27, 2010 Bridge repair: Tier 2 Indiana bat Ohio Columbus, OH FHWA State Rd. 95 over Whetstone Cr. Bridge Repair (5-page PDF; 26KB) RE: MRW-95-8.07 (PID 82192)
March 31, 2010 MOA Project Notifications
April 30, 2010 Pipeline spill response - Marathon Indiana bat Illinois Rock Island, IL EPA Marathon Pipeline Spill Response (9-page PDF)
February 17, 2010 Interstate highway construction: Tier 2 Indiana bat Indiana Bloomington, IN FHWA I-69 Extension from Evansville to Indianapolis, Section 2 (PDF)
Feb. 10, 2010 Road widening and curve reduction: Tier 2 Indiana bat Ohio Columbus, OH FHWA Pleasantville Road Widening (5-page PDF; 25KB) RE: FAI-CR17-3.23 (PID 75143)
Jan. 29, 2010 Highway interchange reconstruction: Tier 2 Indiana bat Ohio Columbus, OH FHWA US 24 and US 127 Interchanges (5-page PDF; 25KB) RE: PAU/DEF-24-Abandonment (PID 82895)
January 26, 2010 State Road 794 realignment: Tier 2 Indiana bat Ohio Columbus, OH FHWA SR 794 Realignment (PDF)
January 22, 2010 Wildlife and forest vegetation management Indiana bat Kentucky Frankfort, KY US Forest Service Land Between the Lakes National Recreation Area (105-p age PDF; 24MB)
January 13, 2010 Bridge replacement and road realignment: Tier 2 Indiana bat Ohio Columbus, OH FHWA Green Road bridge replacement (PDF)
December 11, 2009 Bridge replacement: Tier 2 Indiana bat Ohio Columbus, OH FHWA Fifth St. bridge replacment (PDF)
December 9, 2009 Bridge replacement: Tier 2 Indiana bat Ohio Columbus, OH FHWA Rock Spring Road bridge replacement (PDF)
December 1, 2009 Bridge replacement: Tier 2 Indiana bat Ohio Columbus, OH FHWA Dodridge Rd. bridge replacement (PDF)
November 23, 2009 Construction Indiana bat New York Cortland NY Corps of Engineers Adams Fairacre Farms Store (PDF)
October 21, 2009 Interstate highway construction: Tier 2 Indiana bat Indiana Bloomington FHWA I69 Extension, Section 3
October 16, 2009 Bikeway construction: Tier 2 Indiana bat Ohio Columbus Federal Highway Administration Bikeway along Miami and Erie Canal Feeder towpath in Shelby County, Ohio (PDF)
October 9, 2009 Lysine Plant expansion Indiana bat Iowa Rock Island Illinois FO Corps of Engineers Ajinomoto Heartland Plant Expansion (PDF)
October 7, 2009 Widening and other improvements; Tier 2 Indiana bat Ohio Columbus, Ohio Federal Highway Administration Byers Road Project (35-page PDF; 148KB) (PID 79492)
September 9, 2009 Fence Replacement: Tier 2 Indiana bat Ohio Columbus, Ohio Federal Highway Administration IR-90 Fence Replacement (4-page PDF) RE: D12-Fence-FY2010 (PID 84897)
August 31, 2009 Bridge rehab: Tier 2 Indiana bat Ohio Columbus, Ohio Federal Highway Administration SR 235 Bridge Rehabbing (5-page PDF) RE: GRE-SR235-11.10 (PID 86909)
August 24, 2009 Interstate highway reconstruction: Tier 2 Indiana bat Ohio Columbus, Ohio Federal Highway Administration I-270 Southwest Outerbelt Reconstruction (5-page PDF) RE: FRA-270-2.60 (PID 76191)
August 14, 2009 Culvert replacements: Tier 2 Indiana bat Ohio Columbus Federal Highway Administration State Rte. 634 in1 Putnam Cty., Ohio (PDF)
August 13, 2009 Highway improvement: Tier 2 Indiana bat Ohio Columbus Federal Highway Administration Improve US-250 (5-page PDF) RE: HAS-250-11.72 (PID 81587)
August 5, 2009 Interstate and interchanges upgrades: Tier 2 Indiana bat Ohio Columbus, Ohio Federal Highway Administration I-75 and 5 interchanges Upgrades (5-page PDF) RE: ALL-75 (PID 76691)
August 4, 2009 Rail Line relocation: Tier 2 Indiana bat Ohio Columbus Federal Highway Administration Rail Line Relocation - Mahoning and Trumbull Counties, Ohio (PDF)
July 27, 2009 Prescribed Burn - habitat management and hazard fuels reduction: Tier 2 Indiana bat Ohio Columbus U.S. Forest Service Wayne National Forest: Lake Vesuvius, Bluegrass, Fradd Hollow, and Handley Branch Project Areas
July 27, 2009 Bridge replacement: Tier 2 Indiana bat Ohio Columbus, Ohio Federal Highway Administration US 22 Bridge Replacement (5-page PDF) RE: HAS-22-9.23 (PID 84220)
July 9, 2009 Highway improvement Indiana bat Ohio Columbus Federal Highway Administration State Rd. 212 Improvement in Village of Zoar (PDF)
June 10, 2009 Amended Forest Plan: new standards for running buffalo clover management Indiana bat Missouri Columbia, Missouri U.S. Forest Service Mark Twain National Forest: Amended Forest Plan (PDF)
June 3, 2009 Military training, construction, forest & vegetation mgmt., outdoor recreation Indiana bat New York Cortland, NY Department of the Army Activities on Fort Drum Military Installation (2. 51MB PDF)
April 23, 2009 Highway reconstruction Indiana bat Ohio Columbus Federal Highway Administration Highland Road, Macedonia in Summit County, Ohio (PDF)
April 9, 2009 Highway improvement Indiana bat Ohio Columbus Federal Highway Administration Improve SR-152 in Jefferson County, Ohio (PDF)
March 30, 2009 Bridge replacement: Tier 2 Indiana bat Ohio Columbus, Ohio Federal Highway Administration Sprucevale Rd. Bridge Replacement (6-page PDF) RE: COL-CR428-6.65 (PID 24452)
March 23, 2009 Timber management: Tier 2 Indiana bat Missouri Columbia U.S. Forest Service Mark Twain National Forest: Shirley Project (PDF)
February 2, 2009 Crop Tree Release: Tier 2 Indiana bat Ohio Columbus U.S. Forest Service Wayne National Forest: Crop tree release (PDF)
December 11, 2008 Bike path construction: Tier Indiana bat Ohio Columbus, Ohio Federal Highway Administration Yellow Spring Bike Path Connector (4-page PDF) RE: GRE-Yellow Springs Bike Connector (PID 78491)
November 26, 2008 Bikeway construction Indiana bat Ohio Columbus Federal Highway Administration Wolf Creek Bikeway - Montgomery County, Ohio (PDF)
November 13, 2008 Road realignment: Tier 2 Indiana bat Ohio Columbus, Ohio FHWA Realignment/relocation of CR 430 (5-page PDF) RE: COL-CR 430-Calcutta/Smith Ferry Road (PID 22329)
November 12, 2008 Bridge replacement Indiana bat Ohio Columbus Federal Highway Administration Scioto River Bridge on CR13B - Marion Cty., Ohio (PDF)
October 16, 2008 Hillside stabilization Indiana bat Ohio Columbus, Ohio FHWA Mohican State Forest hillside stablilization (5-page PDF) RE: ASD-97-4.25 (PID 82812)
August 23, 2008 Lake creation and residential development Indiana bat Iowa Rock Island, Illinois U.S. Army Corps of Engineers Whitebreast Creek Project (PDF)
June 5, 2008 Approval and Participation in Conservation MOA in Kentucky Indiana bat Kentucky Frankfort Kentucky U.S. Fish & Wildlife Service Indiana Bat Conservation MOA (PDF)
June 2008 Construct 4.3 miles of 4-lane highway Indiana bat New York Cortland, New York Federal Highway Administration Fort Drum Connector Project (PDF)
April 10, 2008 Replacement bridge with culvert: Tier 2 Indiana bat Ohio Columbus, Ohio Federal Highway Administration State Rte. 217 Bridge Replacement (6-page PDF) RE: LA W-217-9.300 (PID 13628)
April 2, 2008 New road construction and storage building construction Indiana bat Ohio Columbus US Forest Service Wayne NF: Nelsonville Wareyard Construction Project (Word file)
March 26, 2008 Modify Incidental Take Statement for prescribed burn: increased fireline length Indiana bat Ohio Columbus US Forest Service Wayne NF: Athens 2006 Prescribed Burning Project (Word file)
February 11, 2008 Road realignment and 2 new bridges: Tier 2 Indiana bat Ohio Columbus, Ohio Federal Highway Administration White Oak Valley Rd. Realignment and Bridges (4-page PDF) RE: BRO-CR21-3.05 (PID 18811)
2008 Fire Retardant Application Indiana bat Nationwide Headquarters US Forest Service All National Forests: Application of Fire Retardants (345-page, 38MB PDF )
December 27, 2007 Replace, relocate, and abandon a bridge: Tier 2 Indiana bat Ohio Columbus, Ohio FHWA Liberty Fairfield Rd Bridge Replacement (4-page PDF) RE: BUT-CR 113 (PID 14114)
December 18, 2007 Realign roadway Indiana bat Ohio Columbus Federal Highway Administration State Rte. 148 Realign (PDF)
December 6, 2007 Establishing trail on abandoned rail road: Tier 2 Indiana bat Ohio Columbus, Ohio Federal Highway Administration North Coast Inland Trail (4-page PDF) RE: SAN-North Coast Inland Trail
PID 80565
November 28, 2007 Highway widening and waste storage areas Indiana bat Kentucky Frankfort, Kentucky Federal Highway Administration U.S. Hwy. 119 Reconstruction (Word file)
November 1, 2007 Conversion of 10,500 linear feet of
riparian stream channel to a lake system
Indiana bat Iowa Rock Island, Illinois U.S. Army Corps of Engineers Big Hollow Lake (31 page PDF)
October 29, 2007 Road relocation Indiana bat Ohio Columbus, Ohio Federal Highway Administration State Rd. 124 Relocation (4-page PDF) RE: MEG-124-56.02-Pclass79807
October 16, 2007 Restore oak-hickory ecosystem: Tier 2 Indiana bat Ohio Columbus, Ohio US Forest Service Wayne National Forest: Pine Creek Forest Restoration (6-page PDF)
October 2, 2007 Construct 8 miles of 4-lane highway Indiana bat Maryland and Pennsylvania State College, PA Federal Highway Administration U.S. 6219 Improvement (PDF)
August 24, 2007 Hardwood Forest Ecosystem Restoration Indiana bat Indiana Bloomington IN US Forest Service Hoosier NF -
Oriole Restoration:
Appended BO (PDF)
August 14, 2007 Fire line reconstruction: Tier 2 Indiana bat Ohio Columbus, Ohio US Forest Service Wayne National Forest: Fire Line Reconstruction (4-page PDF)
August 9, 2007 Highway construction; Interstate highway Indiana bat Indiana Bloomington IN Federal Highway Administration I-69 Tier 2; Section (PDF)
June 27, 2007 Highway construction Indiana bat Indiana Bloomington IN Federal Highway Administration I-69 Tier 2; Segment 1 (PDF)
June 8, 2007 Prescribed fire for hardwood restoration Indiana bat Illinois MIFO US Forest Service Shawnee NF Tier 2;
Hidden Springs Restoration
(Word File)
April 13, 2007 Habitat Restoration: wetland restoration, timber stand improvements, prescribed burns Indiana bat Illinois MIFO US Forest Service Shawnee NF Tier 2;
Big Muddy Habitat Restoration
(Word File)
April 11 , 2007 Prescribed fire Indiana bat Illinois MIFO US Forest Service Shawnee NF Tier 2;
Mississippi Bluffs Restoration
(Word File)
April 6, 2007 Section 404 Permit; 125-acre residential development Indiana bat Ohio Reynoldsburg, Ohio Corps of Engineers Herrington Place Subdivision (PDF)
April 3, 2007 Revised LRMP Indiana bat Kentucky Frankfort, Kentucky US Forest Service Daniel Boone NF: Revised LRMP (PDF)
March 12, 2007 Road widening: Tier 2 Indiana bat Ohio Columbus, Ohio FHWA Kaufman Avenue widening (4-page PDF) RE: GRE-CR54-0.47-PID77694
January 31, 2007 Revised LRMP Indiana bat Pennsylvania State College, PA US Forest Service Allegheny NF: Revised Forest Plan (PDF)
January 26, 2007 Road construction and maintenance Indiana bat Ohio Reynoldsburg OH Federal Highway Administration Ohio DOT Statewide
Transportation Program
(PDF)
January 26, 2007 Appendix A for Ohio DOT Statewide Transportation Program BO Indiana bat Ohio Reynoldsburg OH Federal Highway Administration Ohio DOT Statewide
Transportation Program BO App A
(Excel spreadsheet)
January 16, 2007 Hardwood Restoration: planting, harvesting, thinning, prescribed burns - Appended BO Indiana bat Indiana Bloomington IN FO US Forest Service Hoosier NF: German Ridge
Restoration
(PDF)
Sept. 21, 2006 Commercial timber management activities, and reforestation practices:Tier 2 Indiana bat Pennsylvania State College, PA US Forest Service Allegheny NF: Meads Mill
August 24, 2006 Highway Construction, Operation, and Maintenance - Revised BO Indiana bat Indiana Bloomington IN FO Federal Highway Administration I-69 Alt3C Evansville to Indianapolis (Word File)
July 2006 Forest Plan Revision Indiana bat West Virginia West Virginia FO US Forest Service Monongahela NF: 2006 Forest Plan Revision
June 23, 2006 Gas Pipeline Installation and Maintenance Indiana bat Ohio Reynoldsburg OH US Forest Service Wayne National Forest: White Acre Pipeline (Word File)
June 9, 2006 Road construction - Programmatic BO Indiana bat Kentucky Frankfort, KY FO Federal Highway Administration Kentucky minor road projects (Word file
June 2, 2006 Hazard Tree Removal from Campground Indiana bat Indiana Bloomington IN US Forest Service Hoosier NF:Celina Lake (Word File)
May 31, 2006 Various forest managment and reforestation practices: Tier 2 Indiana bat Pennsylvania State College, PA US Forest Service Allegheny NF:
Blacksnake Project (PDF)
April 20, 2006 Timber harvest, timber management, prescribed burn: Tier 2 Indiana bat Pennsylvania State College, PA US Forest Service Allegheny NF: West Branch Tionesta (PDF)
April 17, 2006 Pipeline construction Indiana bat Virginia Gloucester, VA Federal Energy Regulatory Commission Jewell Ridge Gas Pipeline (PDF)
April 11, 2006 Windthrow Salvage Timber Harvest Indiana bat Indiana Bloomington IN US Forest Service Hoosier NF: Tell City RD (PDF)
March 23, 2006 Forest Diversity: thinning, mid-story herbicide treatment, conversion of pine to hardwoods, prescribed burns Indiana bat Ohio Reynoldsburg OH US Forest Service Wayne National Forest: Gore Greendale (Word File)
March 23, 2006 Thinning and salvage timber harvests Indiana bat Pennsylvania State College PA US Forest Service Allegheny NF:
Eagle Wind Mills (PDF)
March 9, 2006 Revised Land and Resource Management Plan  - Programmatic BO Indiana bat Michigan East Lansing MI US Forest Service Huron-Manistee NF LRMP (PDF)
March 9, 2006 Contour coal surface mining: Supplemental BO Indiana bat West Virginia West Virginia FO Corps of Engineers Laxare East and Black Castle (Word file)
March 6, 2006 Timber harvests and salvage harvests Indiana bat Pennsylvania State College, PA US Forest Service Allegheny NF: Forest Renewal Project
February 22, 2006 LRMP Indiana bat Vermont New England FO US Forest Service Green Mountain NF: Forest Plan (Word)
January 3, 2006 Land Resource Management Plan Indiana bat Indiana Bloomington IN US Forest Service Hoosier NF LRMP (Word File)
2006 Comprehensive Conservation Plan Indiana bat Illinois Marion Illinois Suboffice U.S. Fish & Wildlife Service Crab Orchard National Wildlife Refuge (Word File)
December 28, 2005 Coal Mine - Tier 2 BO Indiana bat Ohio Reynoldsburg Ohio FO US Forest Service Wayne National Forest: Burr Oak Mine (Word File)
December 16, 2005 Five-year Silviculture Research Plan Indiana bat West Virginia West Virginia FO US Forest Service Fernow Experimental Forest: 5-year Research Plan (PDF)
December 13, 2005 Power Lines Indiana bat Ohio Reynoldsburg Ohio FO US Forest Service Wayne National Forest: Kosmos Power Lines (Word File)
December 6, 2005 Salvage and sanitation harvests, felling without removal, control of non-native plants, and restoration of upland water sources Indiana bat Kentucky Frankfort, KY FO US Forest Service Daniel Boone National Forest: 2003 Ice Storm Recovery Project (Word File)
December 1, 2005 Revised Land and Resource Management Plan - Programmatic BO Indiana bat Illinois Marion IL Suboffice US Forest Service Shawnee NF LRMP (Word File)
November 23, 2005 Recreation trails: construction, rerouting, abandoning, rehabbing - Tier 2 BO Indiana bat Ohio Reynoldsburg OH US Forest Service Wayne National Forest: Archery & Horse Trails (Word File)
November 22, 2005 Land and Resource Management Plan - Programmatic BO Indiana bat Ohio Reynoldsburg OH US Forest Service Wayne National Forest: Forest Plan (PDF)
November 9, 2005 Subsidence and drainage restoration - Tier 2 BO Indiana bat Ohio Reynoldsburg OH US Forest Service Wayne National Forest: Straitsville Subsidence Project (Word File)
November 3, 2005 ORV trail project - Tier 2 BO Indiana bat Ohio Reynoldsburg OH US Forest Service Wayne National Forest: Monday Creek Trail (Word File)
October 6, 2005 Interstate Highway Construction Indiana bat Kentucky Frankfort, KY FO Federal Highway Administration I-69 Preferred Alternative #2 from Henderson, Kentucky to Evansville, Indiana (Word file)
September 30, 2005 Highway construction & maintenance: U.S. 24 Indiana bat Ohio Reynoldsburg OH Federal Highway Administration US 24 New Haven to Defiance (PDF)
September 26, 2005 Mark Twain NF: Forest Plan - Programmatic BO Indiana bat Missouri Columbia MO US Forest Service Mark Twain National Forest: Forest Plan (Word File)
September 9, 2005 LRMP Indiana bat New Hampshire New England FO US Forest Service White Mountain National Forest: Forest Plan
July 6, 2005 Timber harvest and reforestation Indiana bat Pennsylvania State College, PA US Forest Service Allegheny NF: Kane Experimental Forest Windthrow
June 16, 2005 Hardwood restoration: thinning and prescribed burns - Tier 2 BO Indiana bat Ohio Reynoldsburg OH US Forest Service Wayne National Forest: Buckhorn Restoration (Word File)
June 15, 2005 Subsidence and drainage restoration - Tier 2 BO Indiana bat Ohio Reynoldsburg OH US Forest Service Wayne National Forest: Monkey Hollow Restoration (Word File)
April 5, 2005 Install lime kiln dust doser for acid mine drainage remediation - Tier 2 Indiana bat Ohio Reynoldsburg OH US Forest Service Wayne National Forest: Essex Doser Project (Word File)
April 1, 2005 Highway construction, operation, & maintenance: U.S. 33 Nelsonville Bypass  Indiana bat Ohio Reynoldsburg OH Federal Highway Administration US 33 Nelsonville Bypass (Word File)
April 1, 2005 Construction of a U.S. Army Training Center Indiana bat Ohio Reynoldsburg OH Department of Defense USAR 88th RRC Training Center (PDF)
March 15, 2005 Timber harvests and timber management: Tier 2 Indiana bat West Virginia West Virginia FO US Forest Service Monongahela National Forest: Desert Branch Project (PDF)
March 7, 2005 Pine thinning - Reinitation of Tier 2 Indiana bat Ohio Reynoldsburg OH US Forest Service Wayne National Forest: Beech Cove (Word File)
February 28, 2005 Road construction and upgrading - Tier 2 BO Indiana bat Ohio Reynoldsburg OH US Forest Service Wayne National Forest: Coe Road (Word File)
February 25, 2005 Prescribed burn - Tier 2 BO Indiana bat Ohio Reynoldsburg OH US Forest Service Wayne National Forest: Darby Creek Burn (Word File)
February 25, 2005 Oak restoration research project: thinning and burning - Tier 2 Indiana bat Ohio Reynoldsburg OH US Forest Service Wayne National Forest: Oak Restoration (Word File)
February 11, 2005 Timber management, reforestation, wildlife habitat improvement, and road construction Indiana bat Pennsylvania State College, PA US Forest Service Allegheny NF: Martin Run (PDF)
February 2, 2005 Timber harvests, thinning, prescribed burns, old-growth designation - Tier 2 BO Indiana bat Missouri Columbia MO US Forest Service Mark Twain National Forest: Possum Trot Project (PDF)
2005 Contour coal mining projects Indiana bat West Virginia West Virginia FO Corps of Engineers Laxare East & Black Castle (Word file)
December 22, 2004 Upgrade trails, timber harvests, noxious weed control, hardwood plantings - Tier 2 BO Indiana bat Missouri Columbia MO FO US Forest Service Mark Twain National Forest: Crescent Project (PDF)
December 2, 2004 Fen restoration, prescribed burns, invasive plant control - Tier 2 BO Indiana bat Missouri Columbia MO FO US Forest Service Mark Twain National Forest: Barton Fen Restoration (PDF)
December 1, 2004 Prescribe burns - Tier 2 BO Indiana bat Missouri Columbia MO FO US Forest Service Mark Twain National Forest: Wolf Mt. Prescribed Burn Project (PDF)
November 4, 2004 Timber Harvest, Prescribed burns, Road Construction - Tier 2 BO Indiana bat Missouri Columbia MO FO US Forest Service Mark Twain National Forest: Delbridge Hazardous Fuels Reduction (PDF)
November 1, 2004 Wellpad construction, Road construction Indiana bat Ohio Reynoldsburg OH US Forest Service Wayne National Forest: Lishburg Oil and Gas Well (Word File)
October 5, 2004 Prescribed Burn - Tier 2 BO Indiana bat Ohio Reynoldsburg OH US Forest Service Wayne National Forest: Hadley Branch Prescribed Burn (Word File)
September 30, 2004 Timber harvests, Reforestation, Prescribed burns, Road Construction, Grazing, Pond rehab, Indiana bat Missouri Columbia MO FO US Forest Service Mark Twain National Forest: Crooked Creek Project (Word File)
September 30, 2004 Timber harvests, prescribed burns, road construction, firelines, vernal pond construction, glade restoration, trail reconsruction Indiana bat Missouri Reynoldsburg OH US Forest Service Mark Twain National Forest: East Fredericktown Project (Word File)
August 30, 2004 Operation and maintenance of navigation channels Indiana bat Illinois, Iowa, Minnesota, Wisconsin Rock Island IL U.S. Army Corps of Engineers Upper Mississippi River and Illinois Water System Navigation Study (Word File)
July 14, 2004 Wellpad and road construction - Tier 2 BO Indiana bat Ohio Reynoldsburg OH US Forest Service Wayne National Forest: Lisk & Cheney Oil and Gas Well (Word File)
July 13, 2004 Wellpad and road construction - Tier 2 BO Indiana bat Ohio Reynoldsburg OH US Forest Service Wayne National Forest: Beck Energy Oil & Gas Well (Word File)
April 29, 2004 Timber management, reforestation, wildlife habitat improvement, recreation, and road construction: Tier 2 Indiana bat Pennsylvania State College, PA US Forest Service Allegheny NF: Spring Creek (PDF)
April 26, 2004 Gate on abandoned mine - Tier 2 BO Indiana bat Ohio Reynoldsburg OH US Forest Service Wayne National Forest: Carbon Hill Gate Closure (Word File)
April 26, 2004 Timber management and reforestation Indiana bat Pennsylvania State College, PA US Forest Service Allegheny NF: Trail's End Re-entry (PDF)
March 22, 2004 Prescribed burn for pine fuels reduction - Tier 2 BO Indiana bat Ohio Reynoldsburg OH US Forest Service Wayne National Forest: Ice Storm Pine Burn Project (Word File)
March 10, 2004 Revised Land and Water Resource Management Plant Indiana bat Kentucky Frankfort, KY FO US Forest Service Daniel Boone National Forest: Revised LRMP (Word file)
March 8, 2004 Prescribed burns - Tier 2 BO Indiana bat Ohio Reynoldsburg OH US Forest Service Wayne National Forest: Oak Restoration Research Project (Word File)
March 8, 2004 Prescribed burns, forest thinning - Amendment to the 2001 Programmatic BO on the LRMP Indiana bat Ohio Reynoldsburg OH US Forest Service Wayne National Forest: Amend 2001 Prog BO on Forest Plan (Word File)
March 8, 2004 Timber management, reforestation, wildlife habitat improvement, and road construction Indiana bat Pennsylvania State College, PA US Forest Service Allegheny NF: Sugar Run (PDF)
March 4, 2004 Prescribed burns, tree felling, firewood removal - Tier 2 BO Indiana bat Missouri Columbia, MO FO US Forest Service Mark Twain National Forest: Fuel Load Reduction in Tornado Path (Word File)
January 13, 2004 2003 Revised Jefferson National Forest Land and Resource Management Plan Indiana bat Virginia, West Virginia, Kentucky Gloucester, Virginia FO US Forest Service Jefferson National Forest: 2003 Revised LRMP (PDF)
December 30, 2003 Remove ice storm-damaged fallen, dead, and dying trees - Amendment to the 2001 Prog. BO Indiana bat Ohio Reynoldsburg OH US Forest Service Wayne National Forest: Icestorm Damage - Fuel Reduction (Word File)
December 29, 2003 Road reconstruction - Tier 2 Indiana bat Missouri Columbia MO FO US Forest Service Mark Twain National Forest: Clear Creek Project (Word File)
December 11, 2003 Prescribed burn: Tier 2 Indiana bat Pennsylvania State College, PA US Forest Service Allegheny NF:
Bradford Oak Administrative Study (Oak Burn) (PDF)
December 3, 2003 Construction, operation, and maitenance of Hwy I-69: Indianapolis to Evansville Indiana bat Indiana Bloomington Indiana FO Federal Highway Administration Hwy 169 (Word File)
November 25, 2003 Timber harvest, prescribed burn Indiana bat Ohio Reynoldsburg OH US Forest Service Wayne National Forest: Bluegrass Ridge Restoration (Word File)
November 17, 2003 Wildlife enhancement, watershed protection Indiana bat Missouri Columbia MO FO US Forest Service Mark Twain National Forest: Middle River Project (Word File)
November 6, 2003 Timber harvest, reforestation, prescribed burns - Tier 2 Indiana bat Missouri Columbia MO FO US Forest Service Mark Twain National Forest: NE Corner Project (Word File)
August 25, 2003 Silviculture treatments over 11 years Indiana bat Michigan East Lansing, MI FO US Forest Service Huron-Manistee National Forest: Walhalla Project (Word File)
August 12, 2003 Prescribed burns Indiana bat Tennessee and North Carolina Cookeville, TN FO National Park Service Great Smoky Mountains National Park (Word File)
August 5, 2003 Drainage improvement: clearing, excavating, riprap Indiana bat Indiana Bloomington Indiana FO U.S. Army Corps of Engineers Big Monon Ditch Project (Word File)
July 17, 2003 Timber harvest, reforestation, prescribed burns - Tier 2 Indiana bat Missouri Columbia MO FO US Forest Service Mark Twain National Forest: Carter Corner II Project (Word File)
June 27, 2003 Timber salvage harvests Indiana bat Pennsylvania State College, PA US Forest Service Allegheny NF: Painter Run Windthrow Salvage Project (PDF)
June 12, 2003 Thinning and burning for pine fuel reduction - forestwide Indiana bat Missouri Columbia MO FO US Forest Service Mark Twain National Forest: Pine Fuel Reduction (Word File)
June 12, 2003 Land Resources Management Plan (Forest Plan)   Indiana bat Michigan East Lansing MI US Forest Service Huron-Manistee National Forest: Forest Plan (Word File)
June 12, 2003 Thinning and prescribed burns for pine fuel reduction: forestwide - Tier 2 Indiana bat Missouri Columbia MO FO US Forest Service Mark Twain National Forest: Pine Fuel Reduction (Word File)
June 6, 2003 Timber management, reforestation, wildlife habitat improvement, and road construction: Tier 2 Indiana bat Pennsylvania State College, PA US Forest Service Allegheny NF:
Countyline-Fourmile Project (PDF)
May 2, 2003 Icestorm-damage tree removal for fuels reduction - Tier 2 Indiana bat Ohio Reynoldsburg OH US Forest Service Wayne National Forest: Ice Storm Fuels Reduction (Word File)
April 30, 2003 Construct and rehabilitate ATV trails - Tier 2 Indiana bat Missouri Columbia MO FO US Forest Service Mark Twain National Forest: Sutton Bluff ATV Trails (Word File)
March 18, 2003 Firewood removal, prescribed burns - Tier 2 Indiana bat Missouri Columbia MO FO US Forest Service Mark Twain National Forest: Western Star Restoration (Word File)
12/20/2002 Salvage wind thrown trees Indiana bat Pennsylvania State College, PA US Forest Service Allegheny NF: Windthrow Salvage
11/21/2002 New trail construction - Tier 2  Indiana bat Missouri Columbia MO FO US Forest Service Mark Twain National Forest: Ozark Trail (Word File)
09/13/2002 Firewood removal, prescribed burns, brush hogging, grass planting, tree planting, timber harvest, invasive plant control, road removal, streambank stabilization, stream crossing improvement, road construction - Tier 2 Indiana bat Missouri Columbia MO FO US Forest Service Mark Twain National Forest: Rams Horn Project (Word File)
08/13/2002 Reduce hazardous fules after tornadoes; construct fire control lines, tree removal - Tier 2 Indiana bat Missouri Columbia MO FO US Forest Service Mark Twain National Forest: Potosi/Fredicktown Ranger District Fuels Reduction (Word File)
07/31/2002 Reduce hazardous fules after tornadoes; construct fire control lines, tree removal - Tier 2 Indiana bat Missouri Columbia MO FO US Forest Service Mark Twain National Forest: Potosi/Fredicktown Ranger District Post-tornado Health and Safety Hazard Abatement
06/07/2002 Reduce hazardous fules after tornadoes; construct fire control lines, tree removal - Tier 2 Indiana bat Missouri Columbia MO FO US Forest Service Mark Twain National Forest: Poplar Bluff Post-tornado Hazardous Tree Removal (Word File)
06/03/2002 Buried powerline installation Indiana bat Indiana Bloomington Indiana FO US Forest Service Hoosier National Forest: Special Use Permit for a Buried Powerline (Word File)
06/03/2002 Buried waterline installation Indiana bat Indiana Bloomington Indiana FO US Forest Service Hoosier National Forest: Special Use Permit for a Buried Waterline (Word File)
06/03/2002 Tornado blowdown removal with prescribed burns and heavy equipment Indiana bat Indiana Bloomington Indiana FO US Forest Service Hoosier National Forest: Tornado Blowdown Fuel Reduction (Word File)
05/31/2002 Timber management, reforestation, wildlife habitat improvement, and road construction: Tier 2 Indiana bat Pennsylvania State College, PA US Forest Service Allegheny NF: Lewis Run (PDF)
04/24/2002 Oak decline project - amendment to include Hine's emerald dragonfly Indiana bat Missouri Columbia MO FO US Forest Service Mark Twain National Forest: Oak Decline Project Amendment (Word File)
03/21/2002 Oak decline project: timber harvest, thinning, prescribed burns - Tier 2 Indiana bat Missouri Columbia MO FO US Forest Service Mark Twain National Forest: Oak Decline Project (Word File)
03/21/2002 Prescribed Fire Program Indiana bat Arkansas Conway Arkansas FO US Forest Service Ozark-Saint Francis National Forest: Amended 1998 BO
03/11/2002 Prescribed burn Indiana bat Indiana Bloomington Indiana FO US Forest Service Hoosier National Forest: Boone Creek Barrens Restoration Project (Word File)
March 2002 Highway Interchange construction and associated development - HCP Indiana bat Indiana Bloomington Indiana FO U.S. Fish & Wildlife Service Interagency Task Force: 6 Points Interchange and Associated Development (Word File)
March 2002 Manongahela NF LRMP Indiana bat West Virginia West Virginia FO US Forest Service Manongahela NF: LRMP (PDF)
02/10/2002 Timber harvest, thinning, site prep, prescribed burns - Tier 2 Indiana bat Missouri Columbia MO FO US Forest Service Mark Twain National Forest: Carter Corner I Project (Word File)
01/04/2002 Prescribed burns, timber harvest, firewood removal, thinning - Tier 2 Indiana bat Missouri Columbia MO FO US Forest Service Mark Twain National Forest: Saltpetre Project (Word File)
11/05/2001 Mark Twain NF - Tier 2; Jones Ranch project Indiana bat Missouri Columbia MO FO US Forest Service Mark Twain National Forest: 01_MO_MTNFjonesRanch.doc
09/ 20/2001 Wayne NF LRMP progrm bio opn Indiana bat Ohio Reynoldsburg OH US Forest Service Wayne National Forest: 01_OH_WNFPrgrm.doc
08/20/2001 Mark Twain NF - Tier 2; Eastwood 2 Project Indiana bat Missouri Columbia MO FO US Forest Service Mark Twain National Forest: 02_MO_EastwoodAmend.doc
07/31/2001 Hoosier National Forest - Land and Resource Management Plan Indiana bat Indiana Bloomington Indiana FO US Forest Service Hoosier National Forest: 01_IN_HoosierLRMP.doc
03/15/2001 Mark Twain NF - Tier 2; Prescribed burning in Doniphan/Eleven Pt District Indiana bat Missouri Columbia MO FO US Forest Service Mark Twain National Forest: 01_MO_OpenWoodland.doc
01/23/2001 Pine Beetle Suppression - Exceeded IT Indiana bat Alabama Daphne, Alabama FO US Forest Service National Forests of Alabama: Modification of 1999 BO IT Statement
11/06/2000 Add't tree clearing for Multi-purpose training range -- amendment Indiana bat Indiana Bloomington Indiana FO Army 00_IN_AtterburyAmend.doc
July 2000 Salvage timber harvest Indiana bat Kentucky Cookeville TN US Forest Service Daniel Boone NF: Salvage from 1998 storm (PDF)
June 2000 Hazard tree removal Indiana bat Kentucky Cookeville TN National Park Service Mammoth Cave National Park: Hazard tree removal and vegetation management (PDF)
May 2000 LRMP with silvicultural amendment Indiana bat Kentucky Cookeville TN US Forest Service Daniel Boone NF: LRMP with amendment (PDF)
05/15/2000 Final BO for the Operation and Maintenance of the 9-Foot Navigation Channel on the UMRS Indiana bat  

Rock Island IL U.S. Army Corps of Engineers 00_RIFO_UMRSOM.doc
04/07/2000 LRMPs Indiana bat North Carolina Asheville, NC US Forest Service Nantahala and Pisgah National Forests: LRMPs (Word File)
January 2000 Relocation of bridge Indiana bat Kentucky Cookeville, TN U.S. Army Corps of Engineers Kentucky Lock Addition Project (Word File)
2000 LRMP Indiana bat New Hampshire and Maine New England FO Concord, NH US Forest Service White Mountain National Forest: LRMP (Word File)
2000 Silvicultural research treatments Indiana bat West Virginia Elkins, West Virginia US Forest Service Fernow
Experimental Forest
(PDF)
2000 LRMP Indiana bat Vermont New England FO Concord, NH US Forest Service Green Mountain National Forest: LRMP (PDF)
12/10/1999 LRMPs in Alabama: programmatic Indiana bat Alabama Daphne, AL US Forest Service All National Forests in Alabama: Forest Plans (Word)
06/23/1999 Mark Twain NF - Land and Resource Management Plan Indiana bat Missouri Columbia MO FO US Forest Service Mark Twain National Forest: 99_MO_MTNFlrmp.doc
06/01/1999 LRMP Indiana bat Pennsylvania State College, PN US Forest Service Allegheny National Forest: Forest Plan
04/26/1999 LRMP Indiana bat Arkansas Oklahoma FO US Forest Service Ouachita National Forest: Forest Plan
04/13/1999 Agricultural Pesticide Application at Newport Chemical Depot Indiana bat Indiana Bloomington Indiana FO Army 99_IN_newport.doc
April 1999 Tank range modernization and streambank stabilization Indiana bat Kentucky Cookeville, TN Army Fort Knox: Yano and Wilcox Tank Ranges (Word)
March 1999 Land Exchange Indiana bat Tennessee Cookeville, TN Tennessee Valley Authority Columbia Dam Project (Word)
October 1998 Construct new range: 80 acres Indiana bat Kentucky Cookeville TN Army Fort Knox: New Range (Word)
October 1998 Construct new training facilities - 2,000 acres Indiana bat Kentucky Cookeville, TN Army Fort Knox: Training Facilities (Word)
06/25/1998 LRMP: programmatic Indiana bat Arkansas Vicksburg, MS US Forest Service Ozark-St. Francis NF: Forest Plan
12/04/1998 Construction and Operation of multipurpose Training Range Indiana bat Indiana Bloomington Indiana FO Army 98_IN_Atterbury128.doc
April 1997 LRMP Indiana bat Kentucky Cookeville TN US Forest Service Daniel Boone NF: Forest Plan (Word)
01/08/1997 Spillway Rehab @ Tippy Dam in MI Indiana bat Michigan East Lansing MI Federal Energy Regulatory Commission 97_MI_TippyDam.doc
January 1997 LRMP Indiana bat Tennessee Cookeville TN US Forest Service Cherokee National Forest: Forest Plan (Word)
09/24/1996 Surface Coal Mining and Reclamation Operations Indiana bat Nationwide Headquarters Office of Surface Mining Surface Mining (PDF)
May 1994 Construct potable water distribution system Indiana bat Kentucky Cookeville TN US Forest Service Daniel Boone National Forest: Jackson County Water System (PDF)
May 1993 Widening highway from 2 to 4 lanes Indiana bat Tennessee Cookeville TN Federal Highway Administration State Rte. 32 Improvement (PDF)
03/26/1991 Construction of new navigation lock Indiana bat Kentucky Cookeville, TN U.S. Army Corps of Engineers Kentucky Lock and Dam (PDF)
07/11/1983 Creek channelization Indiana bat Kentucky Asheville NC Soil Conservation Service Short Creek Watershed Project (PDF)
06/08/1983 3 miles of new transmission line Indiana bat Kentucky Asheville NC Rural Electrification Administration Big Rivers Wescor Transmission Line (PDF)
08/27/1982 Installation of cave gates Indiana bat Tennessee Asheville NC USFWS New Mammoth Cave: Cave Gates (PDF)
03/02/1981 Construction of solvent refined coal demo project Indiana bat Kentucky Asheville NC Department of Energy Daviess County Kentucky: Coal refining demo project (PDF)
10/23/1980 Installation of cave gates Indiana bat Kentucky Asheville NC National Park Service Mammoth Cave National Park: Cave Gates (PDF)
  

Indiana Bat Home

Northern Long-eared Bat Home

Section 7 Home

Midwest Endangered Species Home

 

Last updated: March 25, 2019