Skip Navigation

Open House Public Meeting

Refuge Landscape 512 x 219The U.S. Fish and Wildlife Service will hold a public open house on    May 1, 5:30 - 7:30 pm at the Refuge Visitor Center regarding four step-down management plans for the Rocky Mountain Arsenal National Wildlife Refuge Complex. The public comment period begins April 17 and ends May 16, 2013.

The U.S. Fish and Wildlife Service (Service) is engaged in a National Environmental Policy Act review regarding four “step-down” management plans for the Rocky Mountain Arsenal National Wildlife Refuge Complex. This is a standard process for national wildlife refuges. The plans include the three Refuges located in the Denver metropolitan area, which are the Rocky Mountain Arsenal, Two Ponds, and Rocky Flats National Wildlife Refuges. The step-down plans listed below will be finalized and implemented in summer 2013.

• Habitat Management Plan (HMP) – Provides additional details regarding specific strategies and implementation schedules for meeting wildlife and habitat goals found in the Refuge’s 1996 Comprehensive Management Plan;
• Prairie Dog Management Plan (PDMP) – Outlines methods to control black-tailed prairie dog populations. This plan provides a transparent decision-making process and information on the methods that will be used to control and maintain a healthy and balanced population of prairie dogs on the Refuge;
• Fire Management Plan (FMP) – Provides policy direction for wildland fire suppression and prescribed fire activities on all three Refuges to promote a healthy native habitat for wildlife; and
• Integrated Pest Management Plan (IPMP) – Provides a broad strategy for combating invasive plant species and weed control focusing on early detection and a rapid response program for species with a high potential for spread.

On May 1, 2013, the Service will hold a meeting to hear comments from the public regarding these step-down plans. The open forum meeting will be held from 5:30 – 7:30 pm in the Refuge Visitor Center, located at 6550 Gateway Road in Commerce City, Colorado. During this time, the public will have an opportunity to learn more about the plans and provide their comments, which will be collected for consideration in the final plans. 

 

Electronic Copies of the Four Plans:

Habitat Management Plan  

Habitat Management Plan Figures; Figure H-1  

Black-tailed Prairie Dog Management Plan 

Fire Management PlanAppendix A - D; Appendix E - G; Appendix H 

Integrated Pest Management Plan 

Integrated Pest Management Plan Figure

Directions to the Refuge Visitor Center: From I-70 exit at Quebec Street and go north. Travel approximately 2.8 miles to Prairie Parkway/64th Avenue. Turn right at Prairie Parkway and travel 0.6 miles to Gateway Road. Turn left at Gateway Road. Continue on Gateway Road until you pass through the Refuge entrance. The Refuge Visitor Center is located just inside the entrance at the crest of the hill. Public parking is located on the south side of the building. For additional information, call the Refuge Visitor Center at 303-289-0930.

Copies of the plans on CD are also available at the Refuge Visitor Center for public review beginning April 17 through May 16, 2013. All comments regarding these plans must be postmarked by May 16, 2013, to be considered. Click here for the public comment form. Comments should be mailed to:


U.S. Fish and Wildlife Service

Rocky Mountain Arsenal National Wildlife Refuge

6550 Gateway Road, Building 121

Commerce City, CO 80022

Attn: Refuge Manager

Page Photo Credits — Refuge Landscape - © Dave Showalter
Last Updated: Apr 18, 2013
Return to main navigation