The Service completed this plan
in 2008.
REFUGE EMAIL
REFUGE ADDRESS
Pathfinder National Wildlife Refuge
c/o Arapaho Refuge Complex
953 JC Road #32
Walden, Colorado 80480
REFUGE TELEPHONE
970 / 723 8202
REFUGE WEB SITE
The comprehensive conservation plan sets the management and use of Pathfinder National Wildlife Refuge for 15 years. The refuge is located in central Wyoming in a high plains basin and provides water in this semi-arid environment, which is important for resting and nesting waterfowl and other migratory birds. The National Audubon Society has designated Pathfinder National Wildlife Refuge as an Important Bird Area.
The purpose of the refuge is to serve "as a refuge and breeding ground for birds and other wildlife" (Executive Order 7425).
The refuge consists of four separate units—Deweese Creek, Goose Bay, Sage Creek, and Sweetwater Arm—with open water, wetland, upland, and alkali flat habitats. The refuge overlies portions of the Bureau of Reclamation's Pathfinder Reservoir. Waterbirds such as willet, American avocet, and great blue heron use refuge wetlands, and the uplands provide habitat for pronghorn, mule deer, sage grouse, and other species. A State-listed rare plant, slender spiderflower, is present at the Sweetwater Arm unit.
The following are major actions in the comprehensive conservation plan:

Plan cover showing two pronghorns in upland habitat.
Comprehensive conservation plan (CCP)
CCP 2008 (27 MB PDF)
By section, for faster download:
Approval, contents, summary (PDF)
Chapter 1, introduction (7 MB PDF)
Chapter 2, the refuge (2 MB PDF)
Chapter 3, refuge resources and description
(5 MB PDF)
Chapter 4, management direction (3 MB PDF)
Appendixes (11 MB PDF)
Draft CCP and environmental assessment (EA)
Draft CCP and EA 2008 (13 MB PDF)
By section, for faster download:
Contents, summary (PDF)
Chapter 1, introduction (PDF)
Chapter 2, the refuge (PDF)
Chapter 3, alternatives (3 MB PDF)
Chapter 4, affected environment (4 MB PDF)
Chapter 5, environmental consequences (PDF)
Chapter 6, implementation of the proposed action (1 MB PDF)
Appendixes (5 MB PDF)
Planning process documents
Notice of availability of final CCP 2009 (PDF)
Planning update 2 2008 (PDF)
Notice of availability of draft CCP and EA 2008 (PDF)
Planning update 1 2006 (1 MB PDF)
Notice of intent to prepare a CCP 2006 (PDF)