PCB
OU - PCB Areas Operable Unit
It
was discovered that groundwater at 2 sites is
contaminated with solvents including TCE above
regulatory standards. In June, 2000, USEPA issued
an Explanation of Significant Differences (ESD) to
the PCB OU. The ESD selected multi‑phase extraction
of chlorinated solvent contaminated groundwater,
with limited phytoremediation and monitored natural
attenuation, as the remedial technology to address
the groundwater contamination. The results of the
pilot test conducted as part of design studies
indicate that multi‑phase extraction will not be
effective in significantly reducing TCE
contamination at the site. USEPA issued an
Amendment to the Record of Decision on August 7,
2007 to select a
new remedy for two of the three contaminated
groundwater plumes (Plumes 1 and 3). A second
ROD Amendment for Plume 2 is forthcoming.
PCB OU Overview Map (710 KB PDF file)
Acronyms
The following documents can be found
at:
Southern Illinois University
(618) 453-2818
McLafferty Annex
1830 University Press Drive
Carbondale, Illinois 62901
Hours: Monday - Friday 9:00
a.m. - 5:00 p.m.
U.S. Fish & Wildlife Service
(618) 997-3344
Crab Orchard National Wildlife Refuge
6987 Headquarters Road
Marion, Illinois 62959
Hours: Monday - Friday 8:00 a.m. - 4:00 p.m.
The following are downloadable
documents in Adobe Acrobat format.
2007 ROD Amendment for Groundwater Plumes 1 & 3 (3.5
MB PDF file)
2006
Five Year Review (4.3 MB PDF
file)
2004
Focused Feasibility Study (37.4
MB PDF file)
2000
Explanation of Significant Differences PCB OU
(709 KB PDF file)
1990
Consent Decree PCB OU
(2.73 KB PDF file)
Decision Summary - PCB Areas
(3.68 MB PDF file)
Responsiveness Summary for the Record of Decision
(2.18 MB PDF file)
1990
Remedy for the Polychlorinated Biphenyl Areas
Operable Unit (351 KB PDF
file)
1990
Treatment by Incineration
(398 KB PDF file)
|