Saginaw River and Bay NRDA
Midwest Region

Duck Stamp photo

2008 Federal Duck Stamp Contest

About the Midwest Region

Newsroom

Fish and Wildlife Journal

Wildlife and Habitat

Birds
Conservation Planning
Ecological Services
Environmental Contaminants
Endangered Species
Fisheries
Joint Ventures
Law Enforcement
Mapping and GIS
National Wildlife Refuge System
Science Quality
Small Wetlands Program
Wetlands
Wildlife and Sportfish Restoration

Partners

Congressional Affairs
Native American Programs
Rural Fire Assistance Program

Get Involved

Buy Duck Stamps
Conservation Library
For Kids
Hunting and Fishing
Jobs
Volunteers

Contact Us

Phone: 612-713-5360
Address: BHW Federal Building
One Federal Drive
Fort Snelling, MN 55111-4056

Saginaw River and Bay
Natural Resource Damage Assessment

Dredging Project

Dredging underway on the Saginaw River.  Photo by Jim Bredin.

We finished dredging contaminated sediment from 5 areas in the Saginaw River on July 22, 2001. The final volume of contaminated sediments removed from the river was 342,433 cubic yards.

The U.S. Fish and Wildlife Service (Service) and the Michigan Department of Environmental Quality (MDEQ) worked with the U.S. Army Corps of Engineers to design the dredging project. The Corps managed the project which was carried out by Luedtke Engineering Company of Frankfort, Michigan. Luedtke used a specially designed, gasketted clamshell dredge bucket to remove sediment from the most contaminated parts of the river. Resuspension of material during dredging was controlled with careful use of the gasketted bucket (or conventional bucket when harder materials were encountered) and by silt curtains which completely enclosed the area being dredged. The U.S. Environmental Protection Agency assisted the Service and MDEQ in periodic inspection of the dredging operation in addition to the constant monitoring conducted by the Corps.

The contaminated sediment was transported by barge to a confined disposal facility just outside the mouth of the Saginaw River. The material was loaded into trucks from the barges and then placed within a subcell in the northeast quadrant of the facility. The material will be capped with cleaner material from the Corps' maintenance dredging activities. Cost of the dredging project is estimated at $9.7 million and was paid for with funds from the settlement.

A sediment sampling survey conducted by MDEQ in September of 2003 demonstrated that PCB concentrations in the top six inches of sediment in the areas dredged in 2000-2001 were less than 0.3 ppm (mg/kg, dw). The survey results demonstrate that the remediation goals for the dredging project were met.

News Relating to the Dredging

Bay City Times article "Cleanup of PCBs complete", August 10, 2001. (no longer available online)

Trustee press release "Dredging Completed Ahead of Schedule in Clean-up of Saginaw River and Bay Contaminants", July 23, 2001.(no longer available online)

Bay City Times article "Bay environmental cleanup makes headway", December 7, 2000. (no longer available online)

Summary of Public Meeting on Dredging held November 1999, "Inside Region 3" newsletter (972k pdf format)

Other Dredging Links

For more information on the Cable-Arm dredging technology, visit:
Cable-Arm, Inc. webpages [link to external webpage, see disclaimer below]


 
Last updated: July 17, 2008