Deer Flat National Wildlife Refuge
Comprehensive Conservation Planning
Adobe Acrobat Reader is required to view PDF files. It can be downloaded
here.
Public Input Received
Extended Team Meetings (June 2011)
Work Sessions (September 2010)
Scoping Comment Period (July-September 2010)
Notes and Comments from June 2011 Extended
Team Meetings
We held Extended Team meetings on 15-16 June 2011 with subject-matter
experts from partner agencies. Approximately twenty extended team
members attended this two-day session to provide feedback on the
preliminary draft vision, goals, objectives, and alternatives.
Notes from the meetings and discussions are provided below:
Return to top
Summary of Fall 2010 Work Session
We held two Work Sessions on 23-25 September 2010 to involve stakeholders
in brainstorming possible solutions to key management issues.
Approximately 50 people joined us for the work sessions, including
representatives from local groups with Refuge interests and citizens
who had commented during scoping. Citizens who had offered solution-oriented
comments and who had differing viewpoints on the selected issues
were invited. The sessions were open to the public (a notice was
posted in the Idaho Press-Tribune and on the Refuge web site) and
6 members of the public viewed the work sessions at some point during
the three days.
Participants met for a total of six hours. At the outset, the participants
introduced themselves and explained their interest in Deer Flat
NWR. Next, Refuge staff provided an overview of the Refuge and of
the CCP process. An open question / answer time followed. During
the second half of each session, the participants worked in small
“breakout” groups. Asked to “play Refuge manager for the day,” participants
brainstormed solutions to specific management issues, including
surface water recreation, upland recreation, and hunting.
Return to top
Scoping Comments
The following summarize public comments received during the Public
Scoping period in Summer 2010. Scoping officially ran from 15 July
- 10 September 2010. However, some comments received before and
after those dates are also included in this report.
Scoping Report (PDF
file larger than 500 kb)
Scoping Comments(PDF
file larger than 500 kb)
Return to top
Return to main Refuge Planning page