Stream Survey Publications
Western Coastal Plain Reference Reach Survey - 2010
April 2010
Full Report: 41.4 mb
US 301 Waldorf Area Transportation Project
Natural Resources Working Group
December 2009
Full Report: 56.5 mb
Natural Channel Design Protocols for Baltimore City, Maryland
October 2009
Full Report: 28.9 mb
Moores Run 2008 Abbreviated Geomorphic Condition
and Channel Stability Report
July 2009
Full Report: 98.5 mb
Stream Assessment Protocol for Anne Arundel County, Maryland
January 2009
Full Report: 12.6 mb
Bankfull Discharge and Channel Characteristics of Streams
Piedmont Hydrologic Region
Part One: 518k
Appendix A: 7.9 mb
Appendix B: 439k
Allegheny Plateau and Valley and Ridge Hydrologic Regions
Part One: 822k
Appendix A: 9.6 mb
Coastal Plain Hydrologic Region
Part One: 4.2 mb
Appendix A: 8.2 mb
Hickey Run: Washington, DC
Springhouse Run Stream Restoration
October 2007
Full Report: 2.2 mb
Stony Run Geomorphic Baseline Survey, Baltimore, Maryland
Baseline Report and Appendices
June 2007
Full Report: 21.2 mb
Moores Run, Baltimore City, Maryland
Abbreviated Geomorphic Condition and Channel Stability Resurvey
May 2007
Full Report: 175.6 mb
Daniels Run Stream Restoration, Fairfax VA
Floodplain Analysis Report
March 2007
Full Report: 1.2 mb
Hickey Run, Washington, DC
Watershed and Stream Assessment
December 2005
Full Report
Moores Run,
Baltimore City, MD
Data Collection and Assessment Protocols
for a Geomorphic Condition and Channel Stability Study
May 2004
Final Report: 38.6 mb (5/31/05)
Appendix A: 47.6 mb (Reach photos)
Appendix B: 15.7 mb (Data comparison)
Appendix C: 35.7 mb (Reach data [1 of 3])
Appendix C: 52.8 mb (Reach data [2 of 3])
Appendix C: 15.6 mb (Reach data [3 of 3])
Appendix D: 8.5 mb (Monument information)
Appendix E: 320 k (BEHI)
Appendix F: 9 mb (Longitudinal profile)
Appendix G: 1.3 mb (Stability summary)
Protocol Report: 4 mb
Oxon Run, Washington DC
Watershed and Stream Assessment
September 2003
Final Report
Oxon Run, Washington DC
Stream Restoration Concept Development
April 2004
Final Report 12.7 mb
Appendix A: 1.4 mb (Restoration objectices
Appendix B: 1.7 mb (Selected morphological characteristics)
Appendix C: 948 k (Dimensionless hydraulic geometry)
Appendix D: 1.1 mb (FEMA floodplain maps)
Appendix E: 4.3 mb (Reach 2 figues)
Appendix F: 5.6 mb (Reach 9B fiigues)
Appendix G: 2.7 mb (Concept level cost estimates)
Pine Hill Run, St. Mary's County Maryland
Watershed Assessment, Patuxent River Naval Air Station
October 2005
Final Report 8.7 mb
Riparian Corridor Rapid Assessment Method
December 2001
Full Report 7 mb
Watts Branch Assessment Report
Final Report 9 mb
NRCS Monitoring Report 1.7 mb
Watts Branch Design Report
10 percent Preliminary Concepts 1.5 mb
30 percent Design Report 560 k
30 percent Design Sheets 56.1 mb
West Cuddihy Assessment Report
Final Report 85.5 mb
Appendix A: 14.5 mb (Stream photographs)
Appendix B: 133.3 mb (Detailed charaterization data)
Appendix C: 1.6 mb (Detailed plant species list)
Appendix D: 9.1 mb (Examples of additional assessments)
Apppendix E: 11.8 mb (Protocol field data sheets)
Daniels Run Stream Restoration, Fairfax, VA
30% Conceptual Design Report Final 2.3 mb
Survey andAlternative Analysis Final 25. mb
Daniels Run NCD Process Presentation PowerPoint Presentation 5.5 mb
Natural Channel Design Review Checklist
|